Project Requirements
Minimum requirements
The minimum requirements to be achieved in this project are:
Three types of hardware sensors/boards
occupation detector
temperature and humidity monitoring
smart signs
Integrated LoRaWAN Communication
Ultra Low Power designs, last for at least 1 full year on 3 AAA batteries
Drivers for all hardware
mBed compatible firmware following the Object Oriented Paradigm
A visually appealing dashboard using a frontend framework
A database management system at the backend
An MQTT server for backend communication and frontend updates
CRON jobs to update the displays
A backend framework with a clean REST API
Every separate component dockerized
Approach
The project could be subdivided in multiple major parts:
hardware
device drivers
firmware
database and database management system
visualization
Each topic must be subdivided into smaller topics. Each student should be engaged in at least one of these major project parts. If the sub-project, in which you are involved, is finished, you should join your colleagues to support their design team. Developers can switch teams when priorities shift during the project. After all, the success of the global project depends on each cooperator!
To meet the objectives of the project, some requirements are mandatory:
Define and accept only SMART objectives (Specific Measurable Acceptable Realistic Time Bound)
Plan Ahead, Plan wise. Therefore a Project Management System is the ideal support tool to enable this task. The project will be managed by Redmine.
Efficient distribution and follow-up of tasks within the design team
Agile SCRUM Software Development Methodology
Efficient and streamlined communication between team members, peer-to-peer, bottom-up and top-down
Peer assessment
Agile Development SCRUM Methodology
The team of hardware developers should meet/communicate on a regular basis with the software development team. The use of the iterative and incremental Agile software development methodology of SCRUM (see image below) is mandatory. One of the major contributors to the successful realization of a project is an intense, regular communication between the hardware and the software engineering teams. Detailed agreements on interfaces, connectors, communication protocols, pinout, ... are mandatory and fundamental to guarantee the successful realization of your project within a realistic period of time.
Git
All code and progress should be managed using Git. github.com can be used to create repositories and organize collaboration. Teachers should have full access to the projects, and projects should be public.
Note: Even failed experiments or code not used in the end result must be stored in Git repositories. Code that has not been committed, is code that never existed. Ever!.. Commits can be reverted, test code can be stored inside separate branches. You can even fork the project to experiment. There are multiple options.
Redmine
URL: http://project.labict.be/
Redmine is a flexible project management web application. Written using the Ruby on Rails framework, it is cross-platform and cross-database.
During this first session, a detailed planning must be made for the full length of time for the project. Each member must have at least one task assigned to himself at any moment during the development of the project.
At the end of each project day an evaluation will be made for each group based on the planning and logs of Redmine. Fine-tuning of the planning will be needed as the project advances to create a realistic picture of the progress and current state of the project.
If it's not in the logs, it never happened !
Slack
A slack channel "smart-campus" is created for this project. Preferable all communication and discussions should be done here if it does not concern to Redmine.
https://eo-ict-vives.slack.com/messages/smart-campus/
Report
Reporting is done through this document on GitBook. It does have to adhere to a certain structure:
index page with abstract and table of contents
introduction
actual content
costings
conclusions
sources (where you got your information)
attachments (images, schematics, code, ...) (can be uploaded in documents / files)
GitBook will be locked 1 week after the final presentation; so Wednesday the 30th of May 2018. This means you will not be able change anything anymore after this date.
Final Presentation
The whole group should give a presentation of the final project in the last week. In this presentation you need to give an overview of the work performed and final result. External lectors and people may be attending this presentation and demonstration.
This presentation should include:
5 minutes presentation per person (every member of the group should take part in the final presentation)
10 minutes of demonstration
10 minutes of questions from the audience
Everything should be in English.
Roadmap
Wednesday 7/2 from 8h15 to 11h30 (in 2.85) and monitoraat from 14h45 to 17u45 (in 2.85)
Wednesday 7/3 from 8h15 to 11h30 (in 2.85) and monitoraat from 14h45 to 17u45 (in 2.85)
Wednesday 14/3 from 8h15 to 11h30 (in 2.85) and monitoraat from 14h30 to 15u30 (in 2.85)
Friday 16/3 monitoraat from 15h45 to 17u45 (in 2.75)
Wednesday 21/3 from 14h45 to 18u45 (in 2.85)
Friday 23/3 from 15u45 to 17u45 (in 2.80)
Thursday 29/3 from 8h15 to 11h30 (in 2.85)
Thursday 19/4 monitoraat from 8u15 to 11u30 (in 2.85)
Thursday 24/4 monitoraat from 13h30 to 16u30 - not sure
Thursday 26/4 from 8h15 to 11h30 (in 2.85)
Wednesday 2/5 monitoraat from 8u15 to 11u30 (in 2.65)
Thursday 3/5 from 8u15 to 11u30 (in 2.85) monitoraat from 12u30 to 14u45 (in 2.85)
Wednesday 9/5 monitoraat from 10u30 to 11u30 (in 2.65)
Tuesday 15/05 monitoraat from 12u30 to 15u30 - not sure
Tuesday 17/05 from 8u15 to 11u30 (in 2.85)
Wednesday 23/5 from 8u15 to 11u30 (in 2.85) - Final Presentation
Final notes
"De enige plaats waar succes voor werk komt, is het woordenboek." [Vidal Sassoon] or in English "The only place where success comes before work, is in the dictionary.
"Een expert is iemand die binnen een beperkt vakgebied alle mogelijke fouten heeft gemaakt." or in English "An expert is someone who made every mistake within his professional discipline.
As a matter of fact, your team should always avoid product development disasters, as presented in the following picture: